Operating permit or operating certificate?
| What changes | Operating permit under § 108.450 | Operating certificate under § 108.580 |
|---|---|---|
| Active aircraft | Fewer than 25, including aircraft operated through leases, subcontractors, or subsidiaries. | The proposed section sets no equivalent numerical fleet cap. Check the scope and conditions of the operator’s certificate. |
| Takeoff weight | Up to 110 lb, including payload and attachments. | Section 108.580 would allow aircraft above 110 lb, subject to the applicable aircraft and operating requirements. |
| Population category | Category 3 or lower. | Flights above 110 lb would be limited to Category 4 or lower unless the FAA authorizes otherwise. Subpart E adds requirements for certificated operations. |
The FAA’s preamble connects the permit fleet limit to operational oversight and the weight and population limits to ground risk. Proposed §§ 108.450 and 108.580 and preamble §§ VIII.B.6 and VIII.C.11
Worked example
A company planning an infrastructure inspection with six active aircraft would meet the proposed fleet limit. If a segment crosses a Category 4 area, it would exceed the proposed surveying permit’s population limit and the operator would need to review the certificate pathway. Proposed § 108.450(d) · Population categories
FAQ
Does inspection count as aerial surveying? The FAA includes inspection, mapping, photography, videography, and patrols in the proposed provisions for aerial surveying. Proposed § 108.450
What changes at 25 active aircraft? The proposed surveying permit would allow fewer than 25 active aircraft. At 25, review the proposed operating certificate pathway and its other conditions. Proposed §§ 108.450 and 108.580
How would I fly this inspection today? Start with the current rules for the aircraft and operation. For an otherwise eligible Part 107 operation that needs to fly beyond visual line of sight, the FAA has a waiver process. Part 107 waivers
Related All BVLOS operations · Proposed crew roles · Population map
Reviewed