Drone news briefings

Drone news, November 26: Part 108's paperwork arrives before the rule

The FAA set up its Part 108 application records system, the FCC moved on 450 MHz and 24 GHz, and an Amazon MK30 came down on a Michigan garage.

Daily brief 4 min read Drone news Part 108

The short version: Part 108 still isn't in the Federal Register, but the FAA has quietly set up the records system it will use to process Part 108 applications. The FCC's November 19 meeting took up new drone spectrum at 450 MHz and counter-drone radar at 24 GHz. The FAA is looking into an Amazon MK30 that came down on a Michigan garage roof. Today is Thanksgiving, so the Federal Register doesn't publish; the next brief picks up anything new.

FAA

1. Part 108: still at White House review, but the FAA is building the paperwork pipeline. The BVLOS final rule (RIN 2120-AL82) has been at OIRA since July 10 and hasn't appeared on the FAA's recently published rulemaking list. What did appear: on November 3 DOT published a new Privacy Act system of records, DOT/FAA 860, "UAS Beyond Visual Line of Sight Operations, Parts 108/146" (91 FR 69305). It covers the people behind operator, manufacturer and Automated Data Service Provider (ADSP) applications: contact details, UAS serial and registration numbers, permit and certificate numbers, and citizenship documents for some package delivery operators. Comments close December 3. For pilots: nothing changes yet. Routine BVLOS still means a Part 107 waiver or an exemption. Federal Register notice (govinfo) · FAA recently published rulemaking

2. First Section 927 BVLOS authorization over the Gulf. On November 9 the FAA authorized Skyways to fly its autonomous V2 VTOL beyond visual line of sight from Shell's facility in Gibson, Louisiana, out to a Shell platform, for a pipeline right-of-way inspection and a simulated equipment delivery. The FAA used Section 927 of the 2024 Reauthorization Act, which lets it approve some operations through a waiver instead of rulemaking or an exemption. Worth watching as a template for long-linear inspection work before Part 108 lands. FAA announcement

3. Amazon MK30 down on a garage in Huntington Woods, Michigan. On the evening of November 20 a Prime Air drone came down on a garage roof after a delivery. Amazon says no one was hurt. The FAA confirmed on November 23 that it is investigating; CNBC, as relayed by DroneXL, quotes a preliminary FAA report saying the aircraft "became entangled in power lines during takeoff." The NTSB hasn't said whether it will open a case. Pilot takeaway: wires on departure are still the classic suburban hazard, even for a 78-pound aircraft with a detect-and-avoid stack. ABC7 report · DroneXL on the recovery video

4. On the reading list: a November 10 final rule that names unmanned aircraft. "Inspection Programs for Single-Engine Turbine-Powered Airplanes and Unmanned Aircraft; and Miscellaneous Maintenance-Related Updates." We haven't read the rule text yet, so no claims about what it changes for drones. It gets a full write-up once read. Federal Register

FCC

5. November 19 meeting: 450 MHz drone data links and 24 GHz counter-drone radar. The Commission took up an order that opens the 450 MHz band to safety-related data links between ground stations and crewed and uncrewed aircraft, moves that band from site-by-site licenses toward one nationwide license, and allows ground-based radar at 24.45 to 24.65 GHz on a secondary basis to detect and track drones. Trade press reports it was adopted; the FCC's adopted text wasn't available to us yet, so treat the details as the draft's until it posts. FCC announcement of the vote

6. Already done: 800 MHz opened to drone links (FCC 26-72). Adopted October 29 and released October 30, this order drops a 1991 ban on airborne use and opens 50 MHz of licensed, nationwide low-band spectrum for drone command and control, communications and payload links. FCC 26-72

7. Ultra-wideband rewrite, ET Docket 26-245 (FCC 26-66). The FCC asks whether to allow UWB-based autonomous drone navigation and landing systems, and whether to lift the long-standing ban on UWB aboard aircraft, with ideas like altitude limits and geofencing. With Federal Register publication on November 2, comments fall around December 2 and replies around January 1; confirm the exact dates in the published notice. Relevant if you're building UWB precision landing. FCC NPRM as filed for publication

Upcoming deadlines

  • About Dec 2: comments on the FCC UWB NPRM (ET Docket 26-245).
  • Dec 3: comments on the Part 108/146 records system (DOT-OST-2026-3862).
  • Dec 7: the statutory date trackers cite for publishing the Part 108 final rule.

Not confirmed yet

Trade press mentions new FCC Covered List Conditional Approvals around November 18 to 20. We couldn't confirm them on fcc.gov, so they stay out until the FCC's notice can be read.

How this brief is made

Primary sources first: FAA newsroom and rulemaking pages, the Federal Register (FAA, FCC, NTIA, DOT), FCC releases, NTIA spectrum news, and the BVLOS docket FAA-2025-1908. Industry outlets fill gaps and are labeled when they're the only source. Every item carries a link. Nothing here is legal advice.